- Candidate Information
- How to Interview
- Resume Tips
- Contact Us!

 

 

Name

Street Address

City, State, Zip

Home telephone number

Email address  

 

1997 to Present                       Large Independent

Senior Production Engineer, (1998 - Present), Southern Region – Houston, Texas. 

Responsible for various oil and gas fields in East Texas and the Texas Gulf Coast.  Responsibilities include all phases of completion, work over and production operations specifically hydraulic fracturing, acidizing, artificial lift design, gravel packing, pipeline/facility installations and compression.

  

·         Developed completion/production design for Cotton Valley Lime multi-rig development program.  

·         Served as acquisition team member which successfully bid and acquired the Columbus Field in Colorado County, Texas for +$30,000,000.  

·         Performed development work on (25) wells in Columbia Field increasing production seven-fold (11,000 MCFD).  

·         Abandoned Block 2231 Field located Offshore Galveston County, Texas saving company $500,000 by creating an onsite artificial reef in cooperation with the Texas Parks and Wildlife.  

·         Successfully Coilfrac two Wilcox Tubingless triple wells increasing reserves by 800 MMCF.  Presented results at SPE Study Group.  

 

1984 to 1997                           Major Oil Company

Senior Reservoir Engineer (1992 - 1995), Mid-Continent Region – Oklahoma City Oklahoma.   Responsible for reserve and economic evaluations for projects requiring capital expenditures in MEC's North Texas Region including Colorado and Oklahoma properties.  Responsibilities included preparation of acquisition and divestiture packages pertaining to MEC's leasehold, reservoir sand studies for more efficient development of properties and reserve and performance predictions for >500 wells for MEC's internal reserve report and SEC 10K reports.  Responsible for the evaluation of six (6) of the thirteen (13) property groups in North Texas non-core asset sales package. 

  

·         The valuation engineer for the Elkhart 3D survey area in Anderson Co., Texas successfully completing three (3) wells with booked reserves greater than three times the current average Elkhart producer.  

·         Implemented of tight gas sand study of the Colorado Bend field resulting in approved application of +120,000 acres in Chambers County, Texas for certification as high cost gas wells for severance tax exemption.  At present, company has received greater than $4,000,000 in tax credits.

 

Senior Production Engineer, (1986 - 1992), Gulf Coast Region – Houston, Texas. 

Responsible for all phases of completion, work over and Production operations in East Texas and the Texas Gulf Coast.  AFE preparation for production operation projects and new completions and presentation of capital budget.

   

·         Redesigned fracture treatments in Madison County, Texas - Dickinson sand play resulting in a 20% production rate increase.  

·         Prepared siphon string economic feasibility study used to develop criteria for well selection process.  Prepared study of critical flow rates for the effective liquid removal of gas wells resulting in successful installations of siphon strings and compression for increased gas production.

  

Drilling Engineer, (1985 - 1986), Western Region – Houston, Texas. 

Responsible for preparation and monitoring of all aspects of drilling in East Texas, Gulf Coast (onshore/offshore) and Rocky Mountains including pore pressure prediction, mud design, casing and drill string design and bit hydraulics.  Served as Lead Drilling engineer for Gulf Coast District.  Prepared in-house drilling papers (Multiple Stage cementing; Use of Downhole motors in Directional Drilling and Mud Rheology and Bit Hydraulics).  Conducted study of the Madisonville Field, Madison Co., Texas resulting in 25% savings in rig time and mud costs.  Design and drill (3) offshore wells in state waters, Offshore Galveston Co., Texas.

 

Engineer Trainee (1984 to 1985). 

Assist drilling engineers and foreman in preparation and implementation of drilling operations.  Served as crew member of Roustabout team involving field operations in Cotton Valley Lime gas production.

 

Additional Training: 

Surface stack well control certification, Sigma UBD, Funny Drilling Engineering School, TH Hill Drill String Failure & Prevention, West Engineering Drill Through Equipment, Halliburton Integrated Hole Quality, DTA Cementing and Evaluation

 

B.S., 2001 in Petroleum Engineering from Texas A & M University in College Station, Texas.  (3.65 GPA, with Honors)

 

Registered Professional Engineer in the Sate of Texas